I would like to report a recurring reliability problem encountered during a time-sensitive software delivery project. GPT-6.1 Sol with Extra High reasoning was used extensively. The problem caused substantial rework and nearly led to a missed delivery deadline.
The issue was not simply that an implementation contained bugs. The agent repeatedly changed what it was trying to deliver, despite written requirements, explicit scope restrictions, corrections, and handoff documents.
Environment and attribution limits
- Codex desktop app on Windows, during October 2026.
- Reporting desktop client:
26.1016.62342; this is not assumed to be the client version at every earlier incident. - Saved turn metadata predominantly records
gpt-6.1-solwithxhigh. Some later work used other OpenAI models, and the project also included delegated implementation. - Recorded session versions include
0.162.0-alpha.2,0.162.0-alpha.17.2, and0.163.0-alpha.10.2. These are saved session metadata, not proof of the exact running client version at every incident. - The work spanned long conversations, context compaction, and handoffs to new chats.
I have not isolated every incident to a specific model request, performed a controlled before/after comparison, or established a backend cause. I am reporting observed behavior in a project where GPT-6.1 Sol was used extensively, not claiming that a model-wide regression has been proven.
Observed failure pattern
-
Assumptions became requirements. The agent introduced an interpretation or implementation suggestion, wrote it into project documents, and later treated its own wording as user-approved scope.
-
Corrections did not reliably invalidate old constraints. After an explicit correction, an older interpretation could remain in a plan, handoff, or completion condition and affect later work.
-
Verification expanded the assignment. Requests for observability, recoverability, and controlled execution were generalized into additional checks, repeated investigation, and blocking conditions that were not necessary to prove the agreed outcome.
-
Implementation substitutions were not made explicit. The agent sometimes replaced an agreed approach with a different one without clearly presenting the behavioral difference and obtaining a decision on that change.
-
Completion claims changed their scope. Reports of completion could refer to a local implementation slice, a terminal branch, or a set of tests while the original user outcome was still unmet. Qualifications sometimes appeared in the same response, but the overall completion claim remained misleading.
-
Handoffs propagated the misunderstanding. A new chat could faithfully follow a handoff document that already contained the earlier incorrect interpretation. Starting fresh did not reliably restore the original intent.
The recurring sequence was:
User requirement
→ agent interpretation
→ agent-authored project document
→ handoff or persistent goal
→ implementation and tests based on that interpretation
→ user discovers the mismatch in the actual result
This is a retrospective description of observed incidents, not a deterministic public reproducer. Project details have intentionally been omitted for confidentiality.
What I tried
I supplied detailed requirements, explicit exclusions, written acceptance criteria, corrections, and handoff summaries. I also used new chats and reviews. These helped in individual cases but did not prevent the pattern from recurring.
The project did include legitimate user-approved requirement changes. Those should not be counted as drift. Some recovery and safety mechanisms were also explicitly requested. The failure was in extending or reinterpreting those requirements without keeping their authority and scope clear.
I also reused agent-authored handoff wording in continuation prompts. That is a further attribution limitation and one reason source provenance matters.
Expected behavior
The agent should distinguish user-approved requirements from its own proposals and observed implementation facts. A new instruction should supersede the conflicting old rule wherever that rule affects execution and acceptance. Tests should be checked against the approved requirement, rather than allowing an agent-authored plan to redefine success.
Routine implementation decisions within the agreed scope should remain autonomous. Changes to product scope, workflow, or completion criteria should be presented as an explicit difference before dependent work proceeds.
Possible contributing mechanisms, not confirmed root causes
The incident history suggests loss of requirement provenance, incomplete invalidation of superseded decisions, and handoff summaries that preserve conclusions more reliably than their authority. Verification can then reinforce the wrong objective.
Context compaction may contribute, but the available evidence does not establish that it caused the deviations. Conflicting documents, model switches, orchestration, and ordinary implementation defects are additional confounders. I have no evidence of intentional degradation, hidden routing changes, or a specific deployment change.
Request
Has anyone observed a similar pattern with GPT-6.1 Sol in long Codex tasks?
For OpenAI: what sanitized evidence would best help investigate requirement provenance, superseded decisions, task-state recovery, and the scope of completion claims? A safer handoff should preserve not only the latest summary, but also which decisions the user actually authorized and which outcomes remain unverified.
The practical impact is repeated supervision and repair work on a project that already has explicit requirements. More apparent activity does not help if it is directed at an altered assignment.