I am on Tier 1 and my limit is 2M tokens for batch job on 4o-mini. If I have multiple batch jobs that are 1.5M tokens each, is it possible to run them at the same time without going to Tier 2?
Thanks
I am on Tier 1 and my limit is 2M tokens for batch job on 4o-mini. If I have multiple batch jobs that are 1.5M tokens each, is it possible to run them at the same time without going to Tier 2?
Thanks