Feature Request: Add an Approximate Usage Bar for ChatGPT Work

Feature Request: Add an Approximate Usage Bar for ChatGPT Work

I would really like to see a simple usage indicator added to ChatGPT Work.

It does not need to be an exact calculation of remaining tokens or usage. An approximate visual indicator would be enough — for example, a progress bar showing roughly how much Work capacity has been used and how much is likely to remain before the next reset.

Something as simple as:

Work usage: ██████░░░░ Approx. 60% used
Reset: 9:40 pm

would make a big difference.

I use Work for substantial professional tasks that can run for quite a long time. My main concern is not necessarily the total allowance; it is knowing roughly where I am within that allowance during the working day.

If I could see that I had perhaps 30–40% remaining at lunchtime, I could make an informed decision about whether to start another large Work task or move smaller jobs back into standard ChatGPT.

At present there is a risk of starting a substantial piece of work and then reaching the usage limit partway through the day without much advance indication.

The indicator does not need to predict the exact amount of time remaining because obviously different tasks use different amounts of compute. Even a simple green / amber / red bar, or an approximate percentage combined with the next reset time, would be extremely useful.

The recent addition of the Work button makes Work much easier to access. A visible approximate usage indicator alongside it would make it much easier to manage as part of a normal professional working day.

I support this, but I would strongly suggest separating two different things in the UI:

  • Work quota remaining
  • conversation capacity remaining

They are not the same problem.

A Work session can still have plenty of quota available while the conversation itself is becoming too large to continue safely, especially after long tool-heavy runs.

Conversely, a conversation can still be healthy while the short-term Work allowance is close to exhaustion.

For long-running technical work, both indicators matter:

Work allowance: how much execution budget is still available and when it resets
Conversation capacity: whether this particular conversation is still safe to continue or should be checkpointed and moved to a fresh chat

Even approximate green / amber / red indicators for both would be much more useful than a single usage bar.